After another two days the work at Unity Presbyterian School continues to progress. The front gate now has decorative block work and a gate that has been welded and installed. The block walls on the second level have all been plastered leaving only the beams left without plaster. Today the final concrete forms from last year were stripped preparing the classrooms for finishing touches. A gate has also been made to connect the school to the ranger building.